Mini Hydro Electric Scheme
Freshwater Solutions is assisting Perivale Farms Ltd
to assess the stream ecology and in-stream effects associated with the proposal to abstract water from Gibbs Creek
near Franz Joseph for generating hydro electricity. The proposed scheme faces additional challenges as it is located
within the Westland National Park.